California BIM Coordination
HADVEN supports California construction teams with BIM coordination that follows construction sequencing and field coordination needs, not just model production.
Information first. Commercial action second.
Use the guide below to understand the discipline, then move directly to a service, project case study or schedule review.
Coordination across trades
BIM coordination brings architectural, structural and MEP information together so the project team can identify conflicts before installation. The process should connect model issues to actual trade and sequence decisions.
- Multi-trade model federation
- Clash detection
- MEP coordination
- Shop-drawing coordination
- Construction sequencing context
From clash report to field decision
A clash report is only the beginning. Effective coordination requires issue triage, trade communication, model revision, re-checking and documentation of what was resolved.
- Issue prioritization
- Navisworks review
- Revit model coordination
- Coordination issue tracking
- Closeout / as-built context
Connected to project controls
BIM becomes more useful when coordination decisions connect to sequencing and schedule logic. HADVEN treats BIM as part of the construction-controls environment rather than an isolated design deliverable.
- BIM + schedule coordination
- 4D context when requested
- Model-based constructability review
- Project-controls communication
Common questions
What does BIM coordination involve?
Architectural, structural and MEP models are federated and checked for conflicts with clash detection software such as Navisworks. Each conflict is tracked to resolution so the field receives a coordinated design.
Can the model be linked to the schedule?
Yes. 4D scheduling links model elements to schedule activities so sequencing and coordination decisions can be checked against the timeline. HADVEN builds the CPM schedule and coordinates the model, so the two stay aligned.
What do you need to get started?
Current models or drawings in native or common exchange formats, the coordination requirements in the contract, and the project schedule if 4D sequencing is required.
What to send us
A fast, accurate first response needs three things. Send whatever you have; we will tell you what else is useful.
- The contract scheduling specification or the relevant sections
- The current schedule in native format (Primavera P6 XER or Microsoft Project) if one exists
- A short description of the project, the question or the delay event

