HADVEN
Request a Quote

Selected Project Experience

HADVEN LLC's Team has managed project controls on federal military installations, active airports, urban infrastructure corridors, and international public works programs. Every schedule listed here was built to survive owner review, agency audit, and — where disputes arose — legal scrutiny.

GovernmentCalifornia

Vehicle Maintenance Shop

Bakersfield, CA

A 24,564 sq ft permanent vehicle maintenance facility built for heavy equipment servicing and readiness operations. HADVEN developed the CPM baseline schedule and carried it through monthly updates, sequencing mechanical, electrical, and structural trades to meet military facility standards and federal construction compliance requirements from notice-to-proceed through closeout.

Federal InfrastructureCalifornia

R.L. Schafer Dam / Success Lake Headquarters

Porterville, CA

A 9,950 sq ft administrative headquarters and 3,200 sq ft maintenance shop supporting federal staff who manage one of California's critical flood control and water storage assets. HADVEN's scope covered full cost and resource loading reconciled to total contract value, paired with BIM coordination that resolved MEP conflicts before they ever reached the field.

Fire & SafetyCalifornia

Chino Valley Fire Station

Chino Valley, CA

A 12,901 sq ft primary fire station and 6,345 sq ft apparatus storage building constructed to essential facility standards within an urban-wildland interface zone. HADVEN's CPM schedule coordinated architectural, structural, and MEP scopes on a compressed timeline, with as-built documentation delivered to meet state agency closeout requirements.

AviationNew York

JFK International Airport — Building 14 Roof Replacement, Phase II

JFK International Airport, New York

Phase II roof replacement on an active building at one of the world's busiest international airports, with zero tolerance for disruption to airside operations. HADVEN's CPM schedule managed complex phasing logistics around live flight operations, and HADVEN prepared the EOT claims analysis submitted to address owner-caused delays encountered during coordination.

InfrastructureBrooklyn, NY

Gowanus Expressway (I-278) — Bridge Corrective Repairs

Brooklyn, New York

Corrective repairs and preventative maintenance on an elevated viaduct carrying hundreds of thousands of daily commuters along a critical urban expressway corridor. HADVEN built a recovery schedule to address accumulated project delays and integrated traffic phasing simulation directly into the schedule logic to protect public safety under live traffic conditions.

InfrastructureTennessee

Smartway ITS Expansion — Interstate 40

Tennessee

A 110-mile corridor expansion of an Intelligent Transportation System, encompassing fiber optic communications infrastructure, dynamic message signs, traffic cameras, and roadside sensors. The scale of the corridor required a specialized linear scheduling methodology, which HADVEN applied to coordinate sequential installation across multiple concurrent work zones along the full 110-mile length.

Parks & RecreationNew York

Pier 51 Playground — Hudson River Park

New York, NY

Reconstruction and installation of new playground equipment at a high-profile urban waterfront park on the Hudson River. HADVEN provided CPM scheduling and monthly progress reporting through construction, then prepared the EOT claims package covering scope changes and design coordination delays that pushed against the original completion date.

HealthcareSuffolk County, NY

Pilgrim Psychiatric Center — Hot Water System Upgrade

Brentwood, New York

Replacement of the domestic hot water system for an active building on a state-managed psychiatric care campus, where continuity of patient care could not be interrupted. HADVEN completed MEP BIM coordination and Navisworks clash detection before any field work began, resolving every conflict in the model rather than on site.

InternationalWorld Bank Program

Khanka & Marsafha Waste Transfer Stations

Qalyubia Governorate

Two municipal solid waste transfer stations totaling 29,550 sqm, built as consolidation hubs to cut long-haul transport and improve waste management efficiency for Greater Cairo. HADVEN delivered full project controls from international tender scheduling through EOT claims analysis, structured throughout to meet World Bank procurement and reporting standards.

Agency-Ready Documentation

Every schedule and claim built to USACE, Caltrans, DOT, and Port Authority reporting standards.

On-Time Delivery

Deliverables issued on the dates committed — no surprises at submission.

Defensible Record

Schedule logic and delay analysis built to withstand audit and legal scrutiny.

Full-Cycle Support

From tender scheduling through as-built closeout — one team, start to finish.

Ready to Add Your Project to This List?

Contact HADVEN LLC today for expert CPM scheduling, BIM coordination, and project controls. We respond to every inquiry within one business day.