Selected Project Experience

A selection of high-profile assignments demonstrating HADVEN's capacity to manage CPM scheduling, BIM coordination, and project controls on complex, multi-stakeholder builds — spanning federal military, aviation, highway, healthcare, and international infrastructure programs.

GovernmentCalifornia

Vehicle Maintenance Shop

Bakersfield, CA

A 24,564 sq ft permanent military vehicle maintenance facility engineered for heavy equipment servicing and operational readiness. The project required precise CPM scheduling across specialized mechanical, electrical, and structural systems, with strict sequencing to meet military facility standards and federal construction compliance requirements.

CPM Baseline Schedule Monthly Updates
Federal InfrastructureCalifornia

R.L. Schafer Dam / Success Lake Headquarters

Porterville, CA

A 9,950 sq ft administrative headquarters and 3,200 sq ft maintenance shop serving as the operational hub for federal staff managing one of California's critical flood control and water storage assets. CPM scheduling included full cost and resource loading integrated with federal project management systems, alongside BIM coordination to resolve MEP conflicts prior to construction.

CPM Baseline Schedule Monthly Updates
Fire & SafetyCalifornia

Chino Valley Fire Station

Chino Valley, CA

A 12,901 sq ft primary fire station and 6,345 sq ft apparatus storage building constructed to essential facility standards in an urban-wildland interface zone. The CPM schedule coordinated architectural, structural, and MEP scopes across a compressed timeline, with as-built documentation prepared for state agency closeout requirements.

CPM Baseline Schedule Monthly Updates
AviationNew York

JFK International Airport — Building 14 Roof Replacement, Phase II

JFK International Airport, New York

Phase II roof replacement on an active building at one of the world's busiest international airports. The CPM schedule managed complex phasing logistics around live airside operations, with zero tolerance for disruption to airport functions. EOT claims analysis was prepared and submitted to address owner-caused delays during the coordination phase.

CPM Baseline Schedule Monthly Updates Cost/Resource Loading
InfrastructureBrooklyn, NY

Gowanus Expressway (I-278) — Bridge Corrective Repairs

Brooklyn, New York

Corrective repairs and preventative maintenance on an elevated viaduct serving hundreds of thousands of daily commuters on a critical urban expressway corridor. A recovery schedule was developed to address accumulated project delays, with traffic phasing simulation integrated into all schedule logic to maintain public safety under live traffic conditions.

CPM Baseline Schedule Monthly Updates
InfrastructureTennessee

Smartway ITS Expansion — Interstate 40

Tennessee

A 110-mile corridor expansion of an Intelligent Transportation System including fiber optic communications infrastructure, dynamic message signs, traffic cameras, and roadside sensors. The project required specialized linear scheduling methodology to manage sequential installation across multiple concurrent work zones spanning the full corridor length.

CPM Baseline Schedule
Parks & RecreationNew York

Pier 51 Playground — Hudson River Park

New York, NY

Reconstruction and installation of new playground equipment at a high-profile urban waterfront park on the Hudson River. CPM scheduling and monthly progress reporting were provided throughout construction, along with EOT claims preparation covering scope changes and design coordination delays that impacted the original completion date.

CPM Baseline Schedule
HealthcareSuffolk County, NY

Pilgrim Psychiatric Center — Hot Water System Upgrade

Brentwood, New York

Replacement of the domestic hot water system for an active building within a state-managed psychiatric care campus. MEP BIM coordination and Navisworks clash detection were completed before any field work began, resolving all conflicts within the model to eliminate disruptions to patient care services throughout the construction period.

CPM Baseline Schedule Monthly Updates
InternationalWorld Bank Program

Khanka & Marsafha Waste Transfer Stations

Qalyubia Governorate

Two municipal solid waste transfer stations totaling 29,550 sqm, serving as consolidation hubs to reduce long-haul transport and improve waste management efficiency for Greater Cairo. Full project controls were delivered from international tender scheduling through EOT claims analysis, structured to meet international procurement and reporting standards throughout.

CPM Baseline Schedule Monthly Updates Cost/Resource Loading

Ready to Add Your Project to This List?

Contact HADVEN today for expert CPM scheduling, BIM coordination, and project controls. We respond within one business day.