CPM Scheduling for NYC DEP Water Infrastructure Projects

NYC DEP operates the city's water supply, wastewater treatment, and sewer systems � among the largest municipal water infrastructure programs in the country. This page explains how HADVEN's CPM scheduling applies to that type of work.

CPM Scheduling for DEP-Type Water Infrastructure Projects

HADVEN LLC provides CPM scheduling for DEP-type infrastructure, drawing on documented municipal water-infrastructure scheduling experience � including the Oasis Garden septic-to-sewer conversion and lift station and the SBMWD Spec. 1869 water main replacement case studies.

What DEP builds and maintains

DEP's capital program covers water supply infrastructure, wastewater treatment plants, sewer and drainage systems, water mains, and reservoir facilities, much of it built or rehabilitated while the surrounding system stays in service.

  • Water treatment and distribution infrastructure
  • Wastewater treatment facility construction and upgrades
  • Sewer and drainage system rehabilitation
  • Reservoir and water-supply projects

What makes DEP work harder to schedule

Utility infrastructure rarely gets to shut down while it's rebuilt. The schedule has to sequence bypass pumping, temporary service, and tie-ins so the system stays live, and it has to track long-lead equipment � pumps, generators, switchgear � that can set the pace for the entire project.

  • Maintaining service during construction (bypass/temporary systems)
  • Phased tie-ins and cutover sequencing
  • Long-lead mechanical and electrical equipment
  • Environmental and regulatory review windows

Services and deliverables

A defensible utility baseline shows submittals, long-lead procurement, and phase-by-phase construction tied together with logic that reflects how the system will actually be kept in service. HADVEN builds that structure and carries it through monthly updates.

  • CPM baseline schedules in Primavera P6
  • Long-lead equipment tracking (pumps, generators, switchgear)
  • Monthly progress updates with narratives
  • Cost and resource loading tied to the schedule of values
  • Recovery scheduling for delayed utility work

Common questions

What does HADVEN provide for NYC DEP-type projects?

HADVEN LLC provides CPM scheduling for DEP-type water and wastewater infrastructure work, drawing on documented municipal water-infrastructure scheduling experience in California, including a lift-station and septic-to-sewer conversion project and a water main replacement program.

What kind of DEP projects does this apply to?

Water treatment and distribution, wastewater treatment facilities, sewer and drainage infrastructure, reservoir and water-supply projects, and related utility rehabilitation work.

Does HADVEN have water/wastewater scheduling experience?

Yes � documented CPM baseline schedules for a septic-to-sewer conversion and lift-station upgrade, and a municipal water main replacement program, both in California. See the water and wastewater scheduling page for details.

Have a DEP or New York water infrastructure project?

Send the contract scheduling specification and HADVEN will outline how the baseline should be structured.