A selection of high-profile assignments demonstrating HADVEN's capacity to manage project controls on complex, multi-stakeholder builds — spanning federal military, aviation, highway, healthcare, and international infrastructure programs.
24,564 sq ft National Guard Vehicle Maintenance Shop at the Bakersfield Army National Guard Readiness Center. A permanent industrial structure requiring precise sequencing of specialized mechanical, electrical, and structural systems under USACE compliance standards.
Design-bid-build construction of a new 9,950 sq ft Headquarters and 3,200 sq ft maintenance shop — the administrative hub for USACE staff managing one of California's critical flood control and water storage infrastructure assets. Full USACE QCS/RMS integration.
12,901 sq ft primary fire station and 6,345 sq ft apparatus storage facility in the Soquel Canyon area — an essential facility project built to enhanced structural specifications for the urban-wildland interface zone. As-built documentation prepared for state agency closeout.
Phase II roof replacement scheduling for Building 14 at one of the world's busiest international airports. Active aviation facility with zero tolerance for operational disruption. Complex phasing logistics coordinated with airside operations, with EOT claims analysis submitted to Port Authority.
Corrective repairs on the I-278 Gowanus Expressway Viaduct — a critical arterial corridor serving hundreds of thousands of daily commuters. Recovery schedule developed to address accumulated delays; traffic phasing simulation validated with NYC DOT traffic engineers under live traffic conditions.
110-mile expansion of the Smartway Intelligent Transportation System from the Shelby/Fayette County line to near I-840. Installation of fiber optic communications, dynamic message signs, traffic cameras, and roadside sensors — requiring specialized linear scheduling methodology across the full corridor.
Reconstruction and new playground equipment installation at Pier 51 on the Hudson River waterfront. CPM scheduling, monthly progress reporting, and EOT claims preparation for scope changes and design coordination delays encountered during construction. Coordination with NYC Parks Department on phased public access.
Domestic hot water system upgrade for Building 83 at Pilgrim Psychiatric Center — a state-managed healthcare facility serving Suffolk County. MEP BIM coordination and Navisworks clash detection within active patient buildings, with zero service disruption planning for a sensitive healthcare environment.
Two municipal solid waste transfer stations (Al-Khanka: 18,000 sqm · Al-Marsafha: 11,550 sqm) serving Greater Cairo. Full international project controls from tender scheduling through EOT claims analysis under World Bank procurement standards. 29,550 sqm total facility footprint.
Contact HADVEN today for expert CPM scheduling, BIM coordination, and project controls. We respond within one business day.