HADVEN supports the complete project controls lifecycle — from tender-phase scheduling through forensic delay analysis at dispute resolution. Every service is delivered using industry-standard software and documented to the level expected by public agencies and federal authorities.
Primavera P6 scheduling built to withstand owner, agency, and legal scrutiny. From baseline development through monthly updates and forensic analysis.
Logic-driven project schedule developed from contract documents and subcontractor input. Built in Primavera P6 to agency specification.
Statused schedule updates with written narrative identifying critical path, float trends, delay causes, and period impacts.
Realistic recovery plans with acceleration measures and revised sequencing — designed to satisfy the owner while remaining executable.
Independent review of contractor schedules on behalf of owners and CMs — evaluating logic, float, critical path, and contract compliance.
Ongoing monitoring of field progress with early identification of slippage and variance conditions before they reach the critical path.
Database setup, coding structure, calendars, report templates, and export formatting for agency submission.
When delays happen, the schedule record is your most important asset. HADVEN builds and preserves that record — and prepares claims documentation that stands up under examination.
Prospective or retrospective analysis quantifying the schedule impact of change events, RFI delays, or owner-caused disruption. Accepted by USACE, Port Authority, Caltrans.
Formal EOT claim preparation — entitlement basis, delay period identification, and schedule analysis — structured for public owner review or legal documentation.
Retrospective schedule reconstruction using windows analysis, collapsed as-built, or impacted as-planned methodology — selected based on the available project record.
Identification and analysis of concurrent delay conditions where both owner and contractor delays overlap — critical for fair and defensible claims resolution.
Multi-trade BIM coordination using Revit, Navisworks, and BIM 360. Conflicts resolved in the model before they reach the field — with full documentation for owner closeout.
Multi-trade model federation across architectural, structural, and MEP disciplines — managed from model receipt through coordinated IFC issuance.
Navisworks hard, soft, and clearance clash detection organized by zone and construction sequence — with full tracking log to resolution.
Revit model development at the LOD specified by your BIM Execution Plan — structured for coordination, quantity takeoff, and downstream use.
Model-based shop drawing packages for MEP, structural, and specialty systems — reviewed against the design model before EOR submission.
P6 schedule linked to 3D model for construction sequencing simulation — ideal for phased projects in occupied or operational facilities.
Model updates reflecting actual installed conditions at closeout — delivered in the format required for owner operations and future renovation.
HADVEN's services are structured around the people who actually use the schedule and who are held accountable when things go wrong.
Baseline schedules, monthly updates, TIA/EOT claim support, and subcontractor coordination from bid through closeout.
Independent schedule review, progress monitoring, and contractor schedule analysis on behalf of the owner or authority.
EOT claims, delay documentation, and BIM coordination against the prime contract schedule for specialty trade contractors.
Contractor schedule review, progress verification, and independent project controls on capital infrastructure programs.
Forensic schedule analysis and expert-quality delay documentation prepared for arbitration, mediation, and dispute proceedings.
Whether you need a baseline schedule next week or forensic analysis of a project that finished two years ago — contact HADVEN and we'll tell you exactly what we can do and how long it will take.